Industry ERP

ERP Software for Laminates, PVC & Acrylic

Thousands of SKUs, one press schedule, and no guessing what is actually in the godown.

Decorative laminate strips in a range of wood-grain finishes
Running on our ERP Skydecor Laminates Pvt. Ltd. Mozaic Laminates

The Industry

What makes Laminates different

A laminate catalogue explodes fast. Every design × thickness × finish × size is its own SKU, dealers order in mixed lots, and the press line only makes money when it runs full. The hard part is not manufacturing — it is information: what to press next, what is sitting in which godown, and which dealer is overdue.

Laminates · Plant View
Active SKUs
4,812
in catalogue
Press Utilisation
88%
▲ 4.2%
Dealer Overdue
₹18.6L
▼ 12%
Batch #PR-1183 — 1.0mm, 12 designsQueued
Godown B → A transfer, 320 sheetsStock
Dealer invoice #INV-9021 + e-way billDispatch

Where It Breaks

What goes wrong in Laminates without a system

01

SKU explosion

Design, thickness, finish, size. One catalogue becomes thousands of items and the stock register stops keeping up.

02

Press scheduling by memory

Which design, which thickness, in what sequence — planned on a whiteboard and changed by phone.

03

Dealer credit and schemes

Dealer-wise limits, schemes and outstanding tracked in Excel. Overdue is discovered too late.

04

Godown stock vs system stock

Physical stock across godowns never matches the ledger until someone does a count.

05

Raw material variance

Base paper, décor paper, resin — consumption drifts from standard, and the margin drifts with it.

How The System Handles It

Modules configured for Laminates

Each one answers a problem on the previous list. Take the modules you need; add the rest when the plant is ready.

SKU & Catalogue Matrix

Design × thickness × finish × size generated as a matrix, not typed one by one. Barcodes per SKU.

Press Planning & Scheduling

Batches planned by design and thickness with a capacity view. Sequence changes ripple to the floor instantly.

Multi-Godown Inventory

Location-wise stock, transfers and reservations in real time. Physical and system counts finally agree.

Dealer Management

Credit limits, schemes, outstanding and order history per dealer. Holds enforced before dispatch, not after.

Consumption & Costing

Raw material issued against standard per batch. Variance per press run, not per quarter.

Dispatch & E-Way Billing

Vehicle-wise loading, dealer invoicing and e-way bill generation from the same order.

Questions We Get

On the first call, Laminates manufacturers usually ask

If yours is not here, ask it — we would rather answer than guess.

That is the normal case for laminates. SKUs are generated as a matrix of design, thickness, finish and size, so a new design with six thicknesses is one entry, not six. Stock, pricing and reporting all work at the SKU level.

Yes. Every godown is a location with its own stock, and transfers between them are recorded as they happen. A dealer order can be fulfilled from whichever location has the sheets.

Each dealer carries a credit limit, outstanding, ageing and any scheme applicable. The system flags a dealer over limit before the dispatch is created, not after the goods have gone.

GST invoicing is built in, and e-way bills are generated from the dispatch itself — vehicle, distance and consignee already known — so nothing is entered twice.

Let’s Talk

See it configured for Laminates

Bring your item list and a typical order. We will walk it through the system as it would run in your plant — and tell you honestly what would need customising.

Chat on WhatsApp +91-9015088555